
Laura
- Jobs booked
- 8
- Reviews
- 3
Reviews (3)
Madden Drainage
10 Investigated blockage. Identified issue with the gullet. Fitted new gulley and raised opening.
Posted 30 August
Prompt response. Clear communication. Talked us through the work and explained process. Reliable. Arranged work at short notice.Verified reviewerJob location: M19FJM ROOFING SPECIALIST LIMITED
10 Repointed chimney stack. Removed and replaced flaunching. Removed and replaced lead flashing.
Posted 22 August
Professional and thorough work. 10 year guarantee provided. Prompt and responsive communication when arranging and carrying out the work.Verified reviewerJob location: M19Ignite Plumbing and Heating M/cr
9.67 Installation of dual fuel cooker.
Posted 14 August
Good communication. Completed job efficiently and was thorough. Friendly.Verified reviewerJob location: M19