Roof texture

Peter R

Jobs booked
1
Reviews
1

Reviews (1)

  • Impulse Renovations LimitedImpulse Renovations Limited
    10

    Bathroom partial renovation

    Posted 08 January

    Two jobs were required: 1 - poor flow of water from cold water tap in basin : examined in detail and agreed that as the mixer unit was about 20 years old it best be replaced including flexi mesh connectors. All done to perfection. 2 - Toilet waste pipe repair carried out by a previous contractor when replacing the toilet with modern unit resulted in need for a "box" to cover the waste pipe and required a support bracket to be fitted behind the cistern. The job was intense and skillfully done. End result - brilliant.
    Verified reviewer
    Job location: PO1