SURFACING AND LANDSCAPING COMPLETED JOBS

Photo 63 of 172
WE DUG AND CORRECTLY PREPARED THE GRASSED AREA, WE THEN INSTALLED A HARDCORE BASE, AFTER LEVELLING THE BASE HOT  TAR WAS INSTALLED AND MACHINE ROLLED ALONG WITH GREY GRANITE AND THEN FINISHED OFF WITH A CHARCOAL BLOCK BORDER TO CREATE AN EVEN EDGE