Download app

Reviews

  • 10

    Pumping main and pumping station installation

    Posted 30 July 2024

    We needed to change our sewage treatment from a septic tank and join the mains which required laying a pumping main 390m up a steep hill. The land at the top was covered in reinforced concrete, some sections were over solid granite rock and lower down it was softer clay. They had all the equipment and expertise to create the trenching and lay pipe backfill & concrete, a directional drill to minimise trenching up the road where it was softer ground and to carry out the work under a Highways Section 50 licence. They worked under tight timeframes were very helpful and courteous. Brilliant choice.
    Verified reviewer
    Job location: TR2