Loft conversion & rear extension
3 bed house refurbishment (08/2021)
2 Bed flat full refurbishment (07/2021)
3 bed house refurbishment (08/2020)
Install two steel beams , engineered wooden floors throughout. (9/2020)
Rear extension with complete 2 bed house decoration (01/2020)
(10/2019) Steel beam installation, bifold doors and refurbishment
2 bed flat refurbishment. 01/2019
1 bed flat refurbishment (Clapton-05/2018)
3 bed house refurbishment and steel beam installation (02/2021
Refurbishment of 3 bed house
3 bed house refurbishment
1 bed flat refurbishment
Leytonstone (10/2018)
Walthamstow (09/2018)
Floors , walls and ceilings. (Walthamstow) 10/2017
Flooring
Interior (Walthamstow) 10/2017
Bathroom fitting (Walthamstow) 11/2017
Commercial decoration
Interior (Leytonstone - 06/2018)
Interior ( Paddington- 06/2018)
Wanstead (09/2018)
Hackney (09/2018)
Floor sanding and oiling
Painting 3 bed house (11/2019)
Flooring & Decoration. 01/2019
Soho office refurbishment
Side extension and finishes
Extension job (July ,2022)
Rear Extension and side return (October, 2022)
Loft conversion and 2 storey extension with side return (still in progress, August, 2022)