Download app

Photos

Full semi detached raked & repointing with damp rods installing and finished with the path cleared, giving it a new lease of life as well as removing drafts and damp.
Full semi detached raked & repointing with damp rods installing and finished with the path cleared, giving it a new lease of life as well as removing drafts and damp.
The side of the house nearing completion with only minor section left to point then moving round to finish with front.
Before works started the majority of the pointing was perishing with deep holes scattered across the property.
Full semi detached raked & repointing with damp rods installing and finished with the path cleared, giving it a new lease of life as well as removing drafts and damp.
Before works started the majority of the pointing was perishing with deep holes scattered across the property.
We raked and repointed the full front wall and changed multiple damaged bricks aswell as installing a new slatted fence.
Before work started very tired looking and damaged wall.
We raked and repointed the full front wall and changed multiple damaged bricks aswell as installing a new slatted fence.
Before work started very tired looking and damaged wall.
Verge repointing
Step cracks repointed and blended
Step cracks repointed and blended
Step cracks repointed and blended
Step cracks repointed and blended
Step cracks repointed and blended
Stone Wall repointed
Stone Wall repointed
During the raking process
During the raking process
Partially repointed
Bottom courses or brick work repointed.
Bottom courses or brick work repointed.
Full side repointed
During the repointing process
During the raking process
Preview of Before.
Full front and side repointed
Full front and side repointed
Preview of Before.
Bottom quarter of gable wall repointed
Before work started
Full stone built back to back house repointed and given a new lease of life
We repointed the trowel mastic back in and finished around all window and door seals
We repointed the trowel mastic back in and finished around all window and door seals
Full areas of decay and missing mastic in need of TLC
During the installation
Patch work strap pointng
The full damp course had to be repointed along the full property
Moss had grown in the perished mortars causing mould inside due to water ingress.
We repointed the problem area also applying anti fungal treatment to prevent the moss returning.
We repointed the problem area also applying anti fungal treatment to prevent the moss returning.
Before we started the repointing work required
Fully ground out and ready for repointing.
Freshly finished with the repointing, customer also asked to quote for lintels and sills repainting to finish off the new look
Large brick built property after having both front and side repointed.
Large brick built property after having both front and side repointed.
Full property after repointing
Mid way clean up as we almost complete the repointing work.
Worn mortar and joints causing issues in bad weather
Repointing half way complete with last parts of mortar raking being completed
Fireplace repointed just raked and ready for clean down
Fully pointed and patched up
Job just finished off with front wall repointing
Full front repointed
Fully ground out ready to repoint
Before work commenced
side wall above garage was letting in moisture and causing damp issues
Jus repointed and resdy for the final clean up
Chimney pointing available
Incorrect drainpipe fitting was leaking water down the property which caused the mortar to perish and have severe damp issues. solved by repointing, fixing pipe correctly and installing damp rods
Before work started
Before work started
After we got to work and made a brilliant job of repointing this side wall
After we got to work and made a brilliant job of repointing this side wall
Cellar wall required repointing due to the loose sandy mortar falling out constantly.
Fully repointed and also extra protective measures from damp by adding tanking slurry to the wall
Before we started work
Before we started work
Just finished with the repointing
Just finished with the repointing
Fully raked and repointed gable wall
Last tradesman botched attempt at repointing
Full back to back terrace house raked and repointed with a 4 day turn around.
Brick pillar tops re cut and laid correctly aswell as a full repoint of the porch
New pillar built on other side to match the wall pillar as well as repointing and repairing of front wall
Before we started work
Work had just begun with relaying the rosemary roof tiles back in place.
Repointing done right, we specialise in property repointing
Repointing done right, we specialise in property repointing
Repointing done right, we specialise in property repointing
Repointing done right, we specialise in property repointing
Preview of F17dhKnMCEAFRXaLfIUV.
Preview of OpVT0CM2GAlztiCzXQnk.
Preview of vKKF2DfmIpOerthfW2D1.