Photos

Partition wall
Room to be converted into a bathroom
Flooring
Boxing in pipes
More boxing in of pipes prior to decorating
Tiling and mosaic tiling side and around bath
Mosaic tiling
Preview of Bathroom installation..
Preview of Bathroom installation..
Looking in through the partition doorway
Preview of Bathroom installation..
Old Outhouse to be demolished for conservatory
New Footings for Conservatory Base
Blockwork ready for Conservatory to sit on
Blinding oversight with sand
Insulating oversight
Dampcourse membrane to stop dampness coming through
Concrete oversight
Finished job  the conservatory was erected by another company, blockwork was rendered at a later date
Arch prior to removal
Acro props supporting wall above
After removal of arch with RSJ in place and plastered
Chimney breast in sitting room prior to removal
Chimney breast taken down from bedroom down to sitting room
RSJ in place after removing archway
The start of building a porch on my house
During construction
more during
Preview of Porch on my own property.
Replacing old fence with new
Preview of New fence..
Preview of New fence..
Preview of New fence..
Original Wardrobe opening
Doors removed and studwork built ready for plasterboard, insulation for soundproofing between bedrooms and plastering
Opening the other side to form wardrobes with doorframes ready for doors
Finished wardrobes
This is the finished product where original wardrobe doors were
Plastered wardrobe where doors were from the other bedroom side
Finished wardrobe doors
Original window to be removed and make opening wider for french doors
Finished product for the internal opening ready for plasterer  window company
Acros and Strongboys in place to support brickwork above internal and external, ready for cutting out brickwork for opening
Finished opening from the outside, used original bricks taken out when cutting opening to match ready for window company
Internal wall to be removed with RSJ ready to be positioned
Acros in position supporting the ceiling joist ready to remove wall
Finished with wall taken down and RSJ in position and dry packed
Finished RSJ in place sitting each end on concrete padstones
Proposed opening drawn on wall
Acros  strongboy in position ready for removing bricks for opening for french doors
Wall opened with RSJ supporting the brickwork above, RSJ supported each end on concrete padstones bearing the load
RSJ boxed in ready for plastering
Whole wall both sided been replastered ensuring no sign of cut out
Finished product with new French Doors fitted ready for customer to decorate