Photos

this corner property was treated for woodworm
Preview of timber treatment.
Preview of timber treatment.
Preview of timber treatment.
there are many timbers within the property and they was all checked for woodworm
sprayed the solid timber shelves
sprayed the solid timber shelves
sprayed the solid timber shelves
sprayed the solid timber shelves
we had to replace a leaking water pipe under the floor
Preview of plastered after render and injection.
a dpc and render with a plaster finsih was applied within the toilet area
Preview of these holes were from a dpc over 20 years ago.
Preview of plastered after render and injection.
Preview of plastered after render and injection.
once we was finished the ceiling was as smooth as marble
2 coats of plaster finsih and trowled perfectly
Preview of after 2 coats of plaster finish.
Preview of robin applying the first coat of plaster to the new ceiling.
filling all the big gaps first
filling all the big gaps first
this is the vapour board installed
this got fitted as the new ceiling to help heat loss
Preview of roof dropped and re insulated.
Preview of we used 75mm insulation for a 100mm void.
Preview of roof dropped and re insulated.
Preview of render after injection.
Preview of render after injection.
Preview of technician installing a new chemical damp proof coarse.
Preview of technician installing a new chemical damp proof coarse.
Preview of internal dpc.
sand and cement applied and dpc cream installed