Work photos

Photo 57 of 133
This job was to install two new SVP's to take new WC / bathroom conversions at this property. The new SVP at the side of the property was in black 110mm uPVC, and the new SVP at the front of the property was in white 110mm uPVC, and had to go through the roof of the porch. This also involved excavating the ground within the porch. Both SVP's joined underground into the existing Foul drains. The new installation at the front joined into an existing Inspection Chamber and the new installation at the side joined on a blind junction, however, access for both lines was installed on the SVP's themselves. Quite a bit of work, the weather was not great at times, but a job well done.