Work photos

Photo 38 of 133
After a full de-scale with HPW Jetting, we CIPP lined two sections (14m) of 100mm (4”) Vitrified Clay pipe at this property in Worthing, where nearly every single joint was badly displaced, causing adverse fall / repeat blockages. We also installed a Patch Liner, as well as replacing a broken cast iron Inspection Chamber cover and frame for a 10T galvanised cover and frame.