Work photos

Photo 85 of 133
This property kept getting blockages in this Inspection Chamber. This was due to the bad design of the joining lateral connections. The benching had also failed in multiple places, causing water ingress to the property, as well as creating a void under the path adjacent to the IC. After excavating, we installed new VC pipe connections and re-instated the benching. Problems solved.