Work photos

Photo 90 of 133
We excavated to remove the roots that were completely blocking this pitch fibre pipe leading to a Soakaway, and managed to pull them out in one go - 12 foot long.. CCTV confirmed the pipe and Soakaway was ok. Flow test successful. Re-instated the patio