Work photos

Photo 68 of 133
This property had a blocked Interceptor trap, with shingle from previous building works. CCTV revealed that a pipe had been cut and not capped, when an extension had been built. This caused shingle to fill the drains for some time.. Removed and rectified. Re-instated the surface and benching in the IC (waterproofed).