We had to excavate and replace a failed 4” VC pipe with a new uPVC installation, to rectify a 2m “belly” (adverse fall) in the existing pipe. This was causing repeat blockages. It had been installed poorly to begin with, as well as the connection from the uPVC SVP to the old VC pipe below was "wonky"; and had a hole in, causing damp ingress underground. Re-instated the surfaces as found.