Work photos

Photo 115 of 133
A CCTV survey (with HPW Jetting to clear 80 years of silt / debris) found that there was a failed Interceptor trap preceding an IC approximately 16 metres D/S from the IC being camera’d. Excavation to remove the old Interceptor and replaced with a straight-through section of uPVC. Re-instated as found