Work photos

Photo 16 of 133
This job was to excavate and replace 16m of failed 4" Vitrified Clay pipe with a new uPVC installation, including two failed gullies; as well as installing two new gullies to take two new RWP connections (the existing drains were combined). A total of four new uPVC roddable bottle gullies. Re-instated multiple surfaces and installed the new RWP’s.