Work photos

Photo 94 of 133
This job was to excavate to find an old access chamber buried under a patio, and to cap two disused lines, as agreed by Southern Water. The top line was from a previously capped and removed Vent Pipe (installed originally before the invention of SVP's) and the bottom line had originally served a WC that had also been removed. Nylon test bungs fitted to prevent the ingress of Surface Water, and then cement cap. Rapid set cement and waterproofer used. Re-instated surface as found, as well as levelling out the patio.