Work photos

Photo 71 of 133
The old Vitrified Clay lines at this property had failed. We replaced them with a new 110mm uPVC installation into the existing unused IC1. We also installed a CIPP Liner between the two IC’s to fix failed joints. New benching in IC1. Re-instated surfaces as found.