Work photos

Photo 98 of 133
Excavation to find and repair cause of water ingress into property. The connection from the uPVC SVP to the VC (Vitrified Clay) rest bend below was non-existent - where the Cast Iron SVP was replaced previously with uPVC, the connection was not made; the uPVC pipe was about one inch away from the VC below, causing years-worth of sewage / foul water to flow under the house, causing a void beneath (pictures taken). No issues found with VC pipe below ground. New 110mm uPVC installation from base of SVP (at ground level) to VC rest bend below, (correct AC4000 coupler used to join uPVC to VC). Re-instated surface.