Left grouting unfinished, cracked tiles and refused to come back and finish the job, numerous ignored calls, texts and emails! Not the greatest standard of work that’s was actually carried out. Joints not matching etc etc
Response from Paul James Tiling
High end barn conversion lol, with the cheapest and worst tiles I've worked with,in spite of that I did a very good job and was very tidy as the pictures show, l put all rubbish in the skip and swept all of upstairs and left it tidier than when I arrived,I was always there when I said I would be and was actually turned away twice because of winds!!! And had to leave because of lost power,I still stuck to the original price that I gave, and also helped put a staircase in place! Despite all the messing around I finished and got paid with no quibbles, didn't tile upstand as I didn't price for it nor was the kitchen in, these high end jobs need silicon in all right angles and the cracked tile was down to movement that you told me about, would have gladly gone back if he would have paid me to do so as an extra,