Download app

Photos

 We also replaced all the sockets and light switches with chromed face plates.
Kitchen tiled, overboarded and skimmed artex ceiling, We also added in some shelves and added in a new socket.
Preview of Kitchen refurb.
Preview of kitchen refurb.
Preview of Kitchen refurb.
Preview of Before.
Preview of Before.
Preview of Before.
New kitchen installed and tiled
New kitchen installed, Ceiling was plastered, room rewired, boiler was relocated and replaced.
New kitchen installed, Ceiling was plastered, room rewired, boiler was relocated and replaced.
Preview of After.
New kitchen installed, Ceiling was plastered, room rewired, boiler was relocated and replaced.
Worktops Butt Joined as requested.
New kitchen installed, Ceiling was plastered, room rewired, boiler was relocated and replaced.
Some very handy storage solutions installed
New hob and oven installeed
integrated washing machine installed
Preview of After.
The floor was installed and everything finalised and ready to be used
Ceiling needed replacing
1st fix electrics for spot lights installed and plasterboarding the ceiling
ceiling was boarded to adhere to fire regulations as there was a bedroom above the kitchen area, it was specified that it was double boarded rather than fire boards.
Installation of new spot lights.
Preview of ceiling plastered and spot lights installed.
Kitchen was ripped out and we chased out the concrete floor for the new waste and water feed for the kitchen island installation.
Preview of this wall needed some TLC.
Wall was patched
Then once we patched the wall, it was skimmed.
Repaired the walls where the tiles were removed
Preview of kitchen installation finished.
Preview of Kitchen install.
We put concealed plug sockets under the island.
Preview of Fridge enclosure installed.
Preview of Kitchen worktop join.
Built in dishwasher.
Preview of Before.
Preview of Before.
Preview of Before.
Preview of During.
Preview of During.
Preview of After.
Preview of After.
Preview of After.
Preview of After.