Ohms Projects
Bradford, West Yorkshire
Checkatrade member since January 2025
Services
- Barn Conversions
- Built In Furniture
- Cupboards
- Emergency Carpenter Service
- General Carpentry
- Handmade Kitchens Designed / Installed
- Joinery
- Log Cabins
- Staircases
- Truss Roofing
- Wooden / Timber Structures
- Accessible Kitchens
- Bespoke Kitchens - Supply & Installation
- Emergency Kitchen Service
- Kitchen Designers
- Kitchen Doors - Installation
- Kitchen Fitters - Installation
- Kitchen Fitters - Supply & Installation
- Kitchen Refurbishments
- Kitchen Showroom
- Replace kitchen cabinets
- Replacement Doors and Drawers
- Worktops
- Worktops - Acrylic
- Worktops - Glass
- Worktops - Granite
- Worktops - Laminate
- Worktops - Marble
- Worktops - Quartz
- Worktops - Solid Wood
- Worktops - Stainless Steel
Customer Reviews
Write a review9.75 /10
Based on 4 reviews over the past 12 months
Quality of work
9.75
Reliability
9.75
Communication
9.75
Reviews (9)
- JJohn C
9 kitchen fitting
Posted 22 June
very good clean and tidy on time and very polite 👍 would recommend. thanksVerified reviewerJob location: LS19 - Hhaydn c
10 Repairing a broken ceiling joist and plastering
Posted 17 April
Ben and his team were fantastic in their repair of our ceiling joist and plastering thereafter. He was punctual, communicative, provided a fair price and cleaned up and replaced everything after he completed the work. Would definitely recommend and will look to use him again for any future joinery work.Verified reviewerJob location: HX7 - AAnne-Marie O
10 kitchen installation
Posted 27 January
Ben and his colleagues did a great job installing our kitchen, and were easily able to solve all sorts of issues we hadn't foreseen in practical and cost-effective ways, like a full fuse board and repositioning the water stopcock. They kept in touch with us throughout the job, and were happy to come back to sort out final touches at a later date. Communication was great overall, they were friendly and professional, and always tidied up well at the end of each day. We've since had them back on other projects, and they've continued to do an excellent job.Verified reviewerJob location: LS13 10 Kitchen refurb.
Posted 03 November 2025
Ben was prompt with calling giving a very competitive quote. He also provided a full list of materials required including measurements making purchasing of worktops etc much easier. Although being busy, he was able to fit us in within our timeframe. Ben, Michael and 2 apprentices started the work approximately 3 weeks after first visiting. The work was completed to a very high standard and everything tidy on completion. We can’t praise these guys enough. We’d like to say more but limited on the review. Thank you again for the work. Highly recommendedVerified reviewerJob location: BD69.67 Kitchen cupboard doors adjustment made.
Posted 03 May 2025
The trade man did a very good service, he was quick, friendly and efficient. I would definitely recommend using him again.Verified reviewerJob location: BD1210 Kitchen fitting
Posted 03 May 2025
Ben and Michael recently fitted my kitchen, and I couldn’t be happier. From the initial visit, Ben gave me confidence in the quality of their work—and they delivered. After being let down by a previous tradesman, their professionalism and attention to detail were a breath of fresh air. They kept me updated throughout and even fixed issues from the last job, some at no extra cost. There’s a small job left, but the finish is impeccable. I’ll definitely use them again and recommend them to others. Huge thanks to you both—you’ve been brilliant!Verified reviewerJob location: WF17
Photos
Company Info
Owner
Mr Benjamin Casimir
Sole Trader
1 years on Checkatrade
VAT Registered
No
Ohms Projects started trading in 2013.
The company covers, Leeds, Bradford, Otley, Ilkley, Harrogate, Halifax and Huddersfield, and is able to support homeowners with jobs in the following categories:
- All aspects of Joinery
- Kitchen fitting
- Kitchen renovations
- Dormas
- Roof structures
- Extensions
- Summer houses
- Electrical
- CCTV and Security
We pride ourselves on integrity, communication is key and works both ways, so from the very small to the really big we guide, give as much advise and support through every Project we do.
We are strong believers in, you pay for what you get, like with everything in life.
All our work is insured and guaranteed for 1 year.
Accreditations and awards

This trade passed up to 12 Checkatrade vetting checks
Member since January 2025
Individual checks
Identification
Proof of address
Financial
Qualifications and accreditations
County court judgement
Open source media
Business checks
Customer Reviews
Company trading history
Company duplication
County court judgement
Enhanced business check
Director checks
