Dug out and filled with 100mm of hardcore
150mm of concrete was used. This is going nowhere.
Starting the roof, all panels are insulated with 100mm thick foam.
Main shell finished.
Waterproof membrane and battens.
Starting to clad the outside with Thermo wood.
Finished! Decking to be done at a later date!
Preview of 7FlpBPWYh3bF52wfwLDH.
Internal wall cladding and laminate flooring.