Photos

A seized stopcock that had to be replaced
Newly installed mains stopcock
New hopper and down pipe installed
kitchen sink waste pipework before being replaced due to being brittle and leaking
New kitchen sink waste pipe
New soil stack installed
Concealed shower valve controls not working, and was replaced with a better looking valve
Replacement concealed shower valve
A pin hole developed in pressure reducing valve. A new valve was installed
Preview of After.
 Customer wanted blended hot tap installed to wash the dogs outdoors
Preview of Before.
New pump fitted and pipework neatened up
Water fountain leaking and had a damaged button at the gym which needed replacing
New fountain tap installed at the gym
Old stopcock
Old stopcock replaced with a leaver valve
Internal stopcock leaking and redundant pipe removed
New stopcock with pipework alterations
Outdoor tap installation
Stainless steel sink before replacement with a modern black composite sink.
Replacement black composite sink
Pipework under sink in mostly plastic push-fit before tidying up in copper.
Pipework under new sink neatened up in copper rather than plastic push-fit.
Kitchen sink before replacement
New kitchen sink and tap
Horizontal unvented cylinder required replacement due to the outer casing rupturing
New horizontal unvented cylinder install complete
Complete unvented cylinder install with insulated pipework
Vented hot water cylinder (gravity system) before being replaced with an unvented cylinder (sealed system)
Old cylinder removed along with shower pump being removed
Completed unvented cylinder install
Completed unvented cylinder install
Stainless steel kitchen sink prior to replacement
New ceramic kitchen sink installed