Photos

lifting mono blocks in a careful manner
Preview of sdOCqVOjSbaSVGSrI6cA.
getting ready to locate water pipe
installed new water mains with trenchless technology
putting mono blocks back to original state
backfill and reinstate ground to its original state
locating pipe to make a connection
using the mole for trenchless technology
using mole to make a hole for the blue pipe. also marking up so the mole can reach its destination
Preview of hAYJ4VV8zEFXbEngRqbD.
making new connection for the 25mm blue pipe
connecting new 25mm blue poly together
connecting up supply to outside tap and into property.
relaying new 25mm poly pipe.
connect back on to old supply to feed the adjoining properties
back filling ground ready to reinstate
reinstating ground to its original state
digging hole to bring new 25mm poly pipe in
connecting New pipe back on to external stop tap
getting ready to reinstate ground
reinstating ground to its original state
connecting new 25mm blue poly inside the property
locating lead main to make a connection for next door
connecting new 25mm  blue poly to feed next Dorr on the shared water supply
connecting new water supply to feed house.
connecting New pipe back on to old external stop tap
getting ready to lift mono blocks
digging Down ready for moling
25mm reached destination after moling
connecting 25mm blue poly to old iron pipe temporarily for extension to be built
mono blocks put back next to stop tap and sand put back in to secure mono blocks
digging Down to bring new 25mm mdpe into property
25mm reached destination after moling
put grass back to its original state
ground reinstated to its original state
reinstating ground to its original state
moled in new 25mm blue poly pipe
installed new stop tap inside house
moling in new water main to supply house
excavate ground to expose water main
repair a 50mm main
install new water mains
moling in new water main to supply house
excavations moling equipment.
excavations for moling equipment
installed new water mains
connecting to external stop tap
driveway excavation taking place
tracing 25mm poly pipe to locate pipe to cover leak
relayed 10 meters of mdpe to cover leak
getting ready for driveway excavation
driveway excavation
connecting pipe to cover leak
reinstated mono block to it's original state
reinstated mono block to it's original state
connecting to external stop tap
connecting water pipe together after moling
connecting pipe before entering house
Moiling new water supply
New water main installation
Water mains entering property with ducting and insulation
New water mains pipe installed and capped off ready for water company to install new stop tap