Initially some very good impressions from the team here and were very accommodating and with a quick install date. The first day impressions were good and the units went in perfectly, however on the second when it became time to do the worktop, the property was left in a poor standard of finish. Metal edging strips were not filed down, long parcel marks left of the wall, laminate edging strips were either not cut straight or chipped, filler left untidy in joints and a 15mm hole left in the plaster which when questioned the reply was “well you could put some filler in it”.
Response from H R Contracts Inc Ltd
I’m really sorry you feel this way, I’m not sure what you mean by the edging strips where not filed down, they come finished and smooth.
Yes there was two small pencil marks on the wall, but I explained to you that I need to mark out things on the wall to drill and draw level lines.
I said my plumber would fill the small hole but you said that you would do it.
I’ve always had good responses to my work as you can see in my reviews.