Reviews

  • Jenny K
    10

    Refreshing our bathroom ahead of putting house on the market.

    Posted 16 January

    We had a few, small fiddly jobs that needed doing - replacing broken tiles and bath panel, resealing sink and bath, replacing a mirrored unit and an extractor fan. Tyler was great, - worked fast and efficiently; communicated with me throughout; cleaned up afterwards; disposed of the old units, and charged a fair price. Happy to recommend, would use again.
    Verified reviewer
    Job location: AL3
  • Bruce P
    8.33

    Comprehensive all in one bathroom fitting

    Posted 12 January

    Tyler at Building solution has done three bathrooms in our house this year in multiple phases. A breath of work was very comprehensive and all the details were handled professionally and expertly. It was great to not have to organise all the different trades people that were needed to completely refit and refurbish three bathrooms and reduce the stress of getting the project over the line.
    Verified reviewer
    Job location: AL1
  • Taheg G
    9.33

    Excellent service, friendly staff.

    Posted 11 December 2025

    Had to get some bathroom work done. Contracted building solutions, who were extremely helpful in assisting me to get the correct materials for the job, and then installed them efficiently and for a very good price.
    Verified reviewer
    Job location: HP2
  • 10

    Above standard

    Posted 05 December 2025

    I had my bathroom tiled and my whole home painted. Couldn’t fault the lads or the work. Great group and the work was done to beyond our expectations. Would definitely recommend and use again.
    Verified reviewer
    Job location: WD18
  • 9.67

    great service

    Posted 19 October 2025

    Found Building solutions on check a trade. Provided a great service and was very tidy. I was kept updated throughout the project , which was delayed by one day. However very happy with the end result , would highly recommend.
    Verified reviewer
    Job location: NW9
  • 1.67

    Disappointment of decorating 2bathrooms and 3bedrooms

    Posted 13 October 2025

    Big disappointment, cowboy job. Please avoid. Bathroom took 2months to complete instead 1month. Decorating of three bedrooms took 2months instead 3weeks. They handed to the client bathrooms with defects as client will not notice. Toilet was leaking, waste pipe in bath was not connected at all and water flooded level Below. Screens for shower were not sealed and were leaking. Radiator did not work and at the end of works when all tiles are laid company said the pipe is blocked and there is nothing for us. So company left the project with unworking radiator.
    Verified reviewer
    Job location: HA5