
Benny Khan
- Jobs booked
- 5
- Reviews
- 2
Reviews (2)
Northern Property Maintenance & Builders
0 LEFT UNFINISHED: Removal of Lats and Replaster of full room
Posted 12 December
Work was handed to multiple people despite being told 3 lads would finish in 4 days from 17 Nov. It took 2 weeks and is still unfinished. First plasterer complained and barely worked before being sacked. Second said the prep was botched and smoked inside my house, leaving cigarette butts outside. The third plastered over wallpaper and also damaged my wall and window sill, and caused a leak on the radiator by not installing a stopper. NEVER ON TIME, NOT TAKEN CARE OF PROPERTY WHILST DOING THE WORK CAUSED MORE DAMAGE.Verified reviewerJob location: BD19Mr Reactive LTD
10 Boiler not working
Posted 08 December
Very professional service, great tradesman.Verified reviewerJob location: BD19