Roof texture

Malvin L

Jobs booked
3
Reviews
1

Reviews (1)

  • Munya JaravazaMunya Jaravaza
    10

    build from flat pack a double oven housing unit cut out the ventilation board and secure the housing

    Posted 17 September

    The housing was assembled and secured with wood screws to add strength, the doors needed to be replaced in order to fit correctly.. The back board needed cutting to allow the oven to fully move home. The plinth needed cutting,all jobs completed with care and professionalism.
    Verified reviewer
    Job location: NR10