
Steve S
- Jobs booked
- 2
- Reviews
- 1
Reviews (1)
A.n.g Plumbing & Heating Ltd
10 Complete bathroom refit
Posted 08 April
Took Afrim just 9 days to completely rip out the existing bathroom including floor to ceiling tiles & water damaged dry walls. He fitted a 24 jet whirlpool bath which caused issues as the bath was very low to the concrete floor. Afrim solved the issue by installing a low level waste and pump. Floor to ceiling tiles, radiator, light, extractor up through the roof in new position, toilet, sink, cabinet, mirror, wall mounted taps & panelled ceiling were also fitted. Afrim worked so hard always arriving early and is extremely polite. Highly recommended & will use again as our boiler needs work.Verified reviewerJob location: MK13