
Saj H
- Jobs booked
- 1
- Reviews
- 1
Reviews (1)
Level Bases
5.33 Base and summer house build
Posted 12 August
Firstly, when they turned up wasn’t happy with the base not being level. After getting it levelled, still wasn’t happy so we agreed they would do it, added a very thin layer to make it level. So much for the 3 inches that were promised. Then this is where the disaster starts, ground still wasn’t quite level. Then the build, damaged door fittings, forget to lay glue on the roof, as his professional Roofer said it didn’t require it, even though instructions clearly stated it should be added. Then gaps and nails showing! AVOID! No after care and don’t care once been paid.Verified reviewerJob location: GU22