Roof texture

GARY P

Jobs booked
1
Reviews
2

Reviews (2)

  • Huston HeatingHuston Heating
    9

    New shower and tiling fitted

    Posted 15 April

    Old shower removed. Old, damaged flooring and tiling removed and new installed. Complete new shower cubicle and tray fitted. Was able to fit us in between other jobs. Took less 2 days to complete. Very happy with the outcome and the company.
    Verified reviewer
    Job location: BT38
  • Huston HeatingHuston Heating
    10

    Refurbishment of shower

    Posted 05 April

    After a major leak with old shower and appointment was arranged for a new shower to be fitted. After a viewing at their showroom work was carried out within a couple of weeks. Damage caused by the leak repaired, walls sealed, new tiling and shower unit fitted all in less than 2 days. Very happy with the result.
    Verified reviewer
    Job location: BT38