
Philip C
- Jobs booked
- 0
- Reviews
- 1
Reviews (1)
David Rammell Wall & Floor Tiling
10 Conservatory Floor
Posted 27 February
Floor levelling had been put down by a previous company. There was issues with the levelling and adherence. David and his son recovered the floor and put down new floor levelling. They then put down new tiles and grouted the Tiles. I wished for the floor to be completed by the Friday. This they completed on time.Verified reviewerJob location: ST3