
Scott H
- Jobs booked
- 1
- Reviews
- 1
Reviews (1)
BB Roofing
9.33 Replacement of existing roofing felt with new breathable membrane and re laying of existing tiles.
Posted 1 week ago
Ben and his team were punctual, knowledgeable and professional throughout the works which included removal of existing tiles, battens and felt, replaced with new breathable membrane, battens, dry fix ridge and verge and re laying of existing tiles.Verified reviewerJob location: NR12