
Richard M
- Jobs booked
- 2
- Reviews
- 2
Reviews (2)
- GGL Electrical
10 Relocation of main cooker socket and new double sockets installed. RCD fitted in consumer unit.
Posted 12 February
Gary was always on time and very informative about the work to be done. Excellent job.Verified reviewerJob location: NR7 S Davey Construction
10 Part wall removal and new lintel installed.
Posted 12 February
Steven was always on time and kept me well informed about the job. He questioned the engineer who had specified a larger than required lintel, resulting in fitting a more appropriate one. New plasterboard and skimming to finish.Verified reviewerJob location: NR7